MARKS SESSION
Details

MARKS SESSION

<kuid:1122642:100023>

Author: Marky78
Kind: profile
Build: 5.5 (TRS22 SP4)
Size: 1.21MB
Uploaded: 2025-01-19
Downloads:
2
-
0
+

MARKS SESSION

You and your colleagues will drive a freightliner from the North of the Basin and delivery your train cars along the way. Donald Industries requires the CP Rail Hoppers first. Once this is done you have a long 12 mile journey with the group until you break off.

Once you reach the junction before LP Engineering driver Alan will head to the South and continue his run without you. You will head towards the East through the mountainous ranges. These canyons can be tough to navigate through so you might want to get some coffee before the next leg.

Be on the lookout for incoming traffic down the mountain and once you get close to the exit another driver will take over as you will need a rest by that stage.

Good luck on the long journey ahead.

    MARKS SESSION
Comments:

Sign in to post a comment

User photos

No one has uploaded a photo of this object yet.