Protrack NSWGR clean stone, mid-life timber, directly spiked
Details

Protrack NSWGR clean stone, mid-life timber, directly spiked

<kuid2:122860:101077:1>

Author: RoysTrainz
Kind: procedural-track
Build: 4.6 (TRS19)
Size: 25.89KB
Uploaded: 2026-01-09
Downloads:
6
-
0
+

Protrack NSWGR clean stone, mid-life timber, directly spiked

Protrack NSWGR procedural-track asset. Flat-bottomed rail held by dogspikes directly driven into timber sleepers of middle age sitting on clean stone ballast.

Author: Leigh Stokes (ElStoko) modified and supplemented original work by Andi Smith (Andi06)

    Protrack NSWGR clean stone, mid-life timber, directly spiked
  • $screenshot$.jpg 22.15KB
  • config.txt 6.04KB

User photos

No one has uploaded a photo of this object yet.


1