Dragons Passage V7.0
<kuid2:134612:100005:3>
| Author: | VIA6415 |
| Kind: | map |
| Build: | 4.3 (Trainz A New Era SP1) |
| Size: | 24.21MB |
| Uploaded: | 2026-02-22 |
| Website: | railroadcustomworks.weebly.com/ |
| Downloads: |
0
-
+
|
Dragons Passage V7.0
Dragons Passage V7.0 for Trainz New Era
This Route is Huge With Over 3k+ asst installed and may take a few days to fully Download. Well Built PC to run Tane is recommended.
( Frist Class Ticket is Strongly Recommend )
Updated and shortten removed used bulk
History of The Route:
Founded in 1880 by a miner who owned a mine in iron valley and built a shote line to the near by town. After the track was layed he get a call to have a shippmet by cart to green hill but because of the time it would take to arrive he thot of a idea to build his meining tracks to the town. hem and hit workers layed mine tracks to green hill and with there mine train made there frist shippmet. A year past and more orders came but due to the limit of what the small train can do the owner seeked funding to build a better train and improve the railway wich he named Green Hill & West Pass Railroad. by 1890 the railroad grew and more trains needed. The owner built The V1 steam train to pull the heavy trains. the next 15 years the railroad grew more as more damage for his loco was needed.in 1910 The Green Hill & West pass got a request for a loco to Rockwell but there was no track with funding form both towns and 10years to build A line was layed to Rockwell and the new V2 steamer made the frist trip. The new owner son of the frist took over the railway and renamed is The Dragons Pass Railroad because it went throw a valley know as dragons passage. ( Know knowing as Black lake throw to barded fish ). The Steam Train known and build in 1909 # 400 to 420 became the back bone for the new line and would change the DPR for ever. The most famed loco that made this happen was #409 wich in 1940 was the frist train to be sent to Eathern city form Green hill and that run never will chage. The line was build in 1939 form Rockwell to sea side town and new doors open The DPR grow into the railroad it is to day and has been for over 100 years ever improving. Enjoy the route
By S&RRW with help form Hert and others, Time went on and over 150 years the DPR wend out of bunesses after the workers went on strick and ended the DPR After all the payout to the workers wore made the owner didn't even have the money or manpower to rip up the track there for he just walked away leaveing the line intacked and complely abanding everything weeks past and no buyers found EWSL pullerd up most of there treacks and DVR took over the Greehill sub but with no mainline fright or work to done was fored to cut there routes short and ship by turcks. This is alook at DP 20 years after Abandemt and the ones rummbleing line now sits quitly waiting for a new life.
Author: dragonharh
- Dragons Passage V7.0
- config.txt 182.54KB
- mapfile.bmk 330 bytes
- mapfile.gnd 66.25MB
- mapfile.lyr 23 bytes
- mapfile.obs 56.10MB
- mapfile.rlr 89 bytes
- mapfile.trc 32 bytes
- mapfile.trk 874.31KB
- thumbnail.bmp 768.05KB
- thumbnail.jpg 116.38KB
User photos
No one has uploaded a photo of this object yet.

Comments:
Sign in to post a comment