NSW Sig Sh-V | 1R Int. | P RH
<kuid2:209857:70326:3>
| Author: | Ranger_51 |
| Kind: | mosignal |
| Build: | 4.5 (Trainz A New Era SP2 ) |
| Size: | 46.27KB |
| Uploaded: | 2026-02-26 |
| Downloads: |
0
-
+
|
NSW Sig Sh-V | 1R Int. | P RH
NSW Shunt (Vertical) | 1-Route Intermediate
Horizontal Shunting signal for 1 route + mainline route. An intermediate shunting signal is placed between 2 running signals and should display PROCEEDE when the running signal displays PROCEEDE
Extended Signal Aspects:
CAUTION LEFT 1 = Shunting 1
PROCEED = Through Indication
- NSW Sig Sh-V | 1R Int. | P RH
- line.jpg 11.08KB
- settingsbanner.jpg 14.73KB
- config.txt 8.95KB
- light_green.texture.txt 55 bytes
- light_green.tga 16.04KB
- light_red.texture.txt 51 bytes
- light_red.tga 16.04KB
- light_yellow.texture.txt 57 bytes
- light_yellow.tga 16.04KB
- img_nsw-sv_1s_i_p.jpg 35.33KB
- target.trainzmesh 802 bytes
- nswsigext.gs 561 bytes
art
corona
icon
model
User photos
No one has uploaded a photo of this object yet.
1

Comments:
Sign in to post a comment