NSW DL | 3a/3a H RD Sh | G
Details

NSW DL | 3a/3a H RD Sh | G

<kuid2:209857:72312:6>

Author: Ranger_51
Kind: mosignal
Build: 4.5 (Trainz A New Era SP2 )
Size: 110.85KB
Uploaded: 2025-07-25
Downloads:
2
-
0
+

NSW DL | 3a/3a H RD Sh | G

NSW Double Light Signal | Home/Diverge Right
A 3-aspect + 3-aspect Home/Diverge signal for right diverging routes. Fitted with the following indicators:
• Subsidiary shunt indicator (can be positioned center, left or right)

Can be configured to display:
• x1 Main route
• x1 Diverge route (right)
• x1 Shunt route

    NSW DL | 3a/3a H RD Sh | G
    art
    asp
  • seq.png 13.99KB
  • com
  • next.png 3.67KB
  • prev.png 3.72KB
  • unknown.png 3.18KB
  • head
  • ovalw.png 3.19KB
  • round.png 3.05KB
  • square.png 3.00KB
  • hood
  • multi.png 3.10KB
  • single.png 3.20KB
  • icon
  • dl_3a3a_h.jpg 58.46KB
  • lens
  • inc_lent.png 3.61KB
  • led_array.png 3.66KB
  • route
  • -0.png 3.01KB
  • -1.png 2.93KB
  • -2.png 2.85KB
  • -3.png 2.91KB
  • 0.png 2.87KB
  • 1.png 2.95KB
  • 2.png 2.85KB
  • 3.png 2.91KB
  • sub
  • sub_1r_c.png 2.92KB
  • sub_1r_l.png 2.93KB
  • sub_1r_r.png 2.92KB
  • text
  • inc_stencil.png 2.93KB
  • led_array.png 2.96KB
  • led_matrix.png 2.65KB
  • config.txt 25.87KB
  • model
  • target.trainzmesh 1.65KB
  • target_offset.kin 93.87KB
  • signalext.gs 4.43KB

User photos

No one has uploaded a photo of this object yet.


1