NSW DL | 3a/3a H 2r Sh ESI | LH
Details

NSW DL | 3a/3a H 2r Sh ESI | LH

<kuid2:209857:72348:1>

Author: Ranger_51
Kind: mosignal
Build: 4.5 (Trainz A New Era SP2 )
Size: 200.18KB
Uploaded: 2026-02-28
Downloads:
0
-
0
+

NSW DL | 3a/3a H 2r Sh ESI | LH

NSW Double Light Signal | Home/Diverge with Elec. Train Stop Indicator
3-aspect + 3-aspect Home/Diverge signal. This signal is fitted with a multi lamp 'Elec Train Stop' indicator which illuminates when the route is set for lines without overhead power.

This signal is fitted with the following indicators:
• ESI (Electric Train Stop Indicator)
• SRI (Shunting Route Indicator, 2-slots)

This signal can display the following route combinations:
• x1 Main
• x1 Diverge
• x2 Shunt

ESI illuminates for tracks with an 'Elect Train Stop' modifier target placed on them.

    NSW DL | 3a/3a H 2r Sh ESI | LH
    art
    asp
  • seq.png 12.38KB
  • com
  • next.png 3.67KB
  • prev.png 3.72KB
  • unknown.png 3.18KB
  • head
  • ovalw.png 3.19KB
  • round.png 3.05KB
  • square.png 3.00KB
  • hood
  • multi.png 3.10KB
  • single.png 3.20KB
  • icon
  • icon.jpg 65.36KB
  • lens
  • inc_lent.png 3.61KB
  • led_array.png 3.66KB
  • route
  • -0.png 3.01KB
  • -1.png 2.93KB
  • -2.png 2.85KB
  • -3.png 2.91KB
  • 0.png 2.87KB
  • 1.png 2.95KB
  • 2.png 2.85KB
  • 3.png 2.91KB
  • text
  • inc_stencil.png 2.93KB
  • led_array.png 2.96KB
  • led_matrix.png 2.65KB
  • config.txt 33.96KB
  • model
  • esi_lamp.trainzmesh 873 bytes
  • esi_lamp_pulse.kin 5.39KB
  • ets_lamp.texture.txt 49 bytes
  • ets_lamp.tga 256.04KB
  • target.trainzmesh 1.34KB
  • target_offset.kin 93.87KB
  • signalext.gs 6.71KB

User photos

No one has uploaded a photo of this object yet.


1