Hoosac_Tunnel_1

<kuid2:210518:10548:2>

Author: bendorsey
Kind: bridge
Build: 2.9
Size: 1.01MB
Uploaded: 2019-06-27
Downloads:
50
-
0
+

Hoosac_Tunnel_1

The hoosac tunnel is unusual in that the lining changes part way thru the bore.
The western end was lined with brick. The eastern end was raw rock. it is not possible to do this with a
single tunnel spline in Trainz however two separate tunnel splines with the same basic dimensions, track
spacing, etc will connect and the connected ends dissapper. There is a screen shot in the folder taken in
surveyor showing the complete tunnel including the door at the eastern end after assembly.

    Hoosac_Tunnel_1
  • ballast3.jpg 7.53KB
  • ballast3.texture.txt 31 bytes
  • end
  • ballast3.jpg 7.53KB
  • ballast3.texture.txt 31 bytes
  • end.im 100.21KB
  • wall31.bmp 384.05KB
  • wall31.texture.txt 29 bytes
  • white flat.jpg 1.36KB
  • white flat.texture.txt 33 bytes
  • hoosac tunnel 1.jpg 12.26KB
  • hoosac_tunnel_1.im 25.48KB
  • screenshot.jpg 124.49KB
  • start
  • ballast3.jpg 7.53KB
  • ballast3.texture.txt 31 bytes
  • start.im 119.63KB
  • wall31.bmp 384.05KB
  • wall31.texture.txt 29 bytes
  • white flat.jpg 1.36KB
  • white flat.texture.txt 33 bytes
  • wall31.bmp 384.05KB
  • wall31.texture.txt 29 bytes

User photos

No one has uploaded a photo of this object yet.