Auto Swing Bridge 1

<kuid2:210518:1500:2>

Author: bendorsey
Kind: mocrossing
Build: 2.4
Size: 435.94KB
Uploaded: 2019-09-18
Loadings:
16
-
0
+

Auto Swing Bridge 1

This is an interactive 2-lane automotive swing bridge, Clearence is approximately 165 feet
on each side in the open position. This is is designed to be triggered to open the span and stop automotive traffic when
some form of water traffic which has been set up as a locomotive comes within the trigger radius on the 4 invisible
tracks in the water.
The blue invisible tracks are at ground level (z axis = 0 ft 0.0 in).
The green invisible tracks are at z axis = -10 meters (-32 ft 9.0 in) below ground level.
The aqua invisible track for the road is z axis = 28 ft 8.5 in above ground level.
Water level should be set at -3 meters (-9 ft 10 in) below ground level.

Author: Benjamin R. Dorsey

    Auto Swing Bridge 1
  • anim.kin 37.83KB
  • bascule.im 851.41KB
  • black.bmp 3.05KB
  • black.texture.txt 28 bytes
  • brightred.bmp 12.05KB
  • brightred.texture.txt 32 bytes
  • concrete 13.jpg 24.66KB
  • concrete 13.texture.txt 34 bytes
  • concrete3.jpg 52.57KB
  • concrete3.texture.txt 32 bytes
  • config.txt 4.23KB
  • metal 36.bmp 192.05KB
  • metal 36.texture.txt 31 bytes
  • wall10.jpg 68.85KB
  • wall10.texture.txt 29 bytes
  • wood2.jpg 23.21KB
  • wood2.texture.txt 28 bytes

User photos

No one has added a photo of this object yet