I-81_NY-17_Split_Part_1
<kuid2:210518:19712:1>
| Author: | bendorsey |
| Kind: | buildable |
| Build: | 2.9 (TS2009) |
| Size: | 1.23MB |
| Uploaded: | 2026-03-20 |
| Downloads: |
2
-
+
|
I-81_NY-17_Split_Part_1
This is part 1 of an interchange between I-81 and NY-17 in Binghamton, NY that also
crosses the Chenango River. No road spline is included as this is designed to match
YARN and YARNISH components. Some textures are from Maddy25. Many thanks to her for
permission to use them. This represents the bridges as they appeared prior to the 2012
project to re-aline the I-81/NY-17 interchange. Made by requeat for the D&H route being
developed by ModelerMJ.
Author: Benjamin R. Dorsey (bendorsey)
- I-81_NY-17_Split_Part_1
- concrete19.jpg 295.50KB
- concrete19.texture.txt 33 bytes
- config.txt 1.94KB
- i-81 ny-17 split part 1.jpg 15.41KB
- maddy bridge girder - green.bmp 48.05KB
- maddy bridge girder - green.texture.txt 50 bytes
- maddy bridge railing.bmp 3.05KB
- maddy bridge railing.texture.txt 43 bytes
- part_1.im 1.01MB
- part_2.im 1.07MB
- part_3.im 1.16MB
- part_4.im 992.21KB
VE48: This asset uses an obsolete trainz-build number. Trainz-build numbers below 3.5 are no longer supported.
VE107: The high-detail meshes total more than 10000 polygons. This may have a negative impact on performance: 0: 58156
VE109: The low-detail meshes total more than 500 polygons. This may have a negative impact on performance: 0: 58156
User photos
No one has uploaded a photo of this object yet.

Comments:
Sign in to post a comment