I-81_NY-17_Split_Part_2

I-81_NY-17_Split_Part_2

<kuid2:210518:19713:1>

Author: bendorsey
Kind: buildable
Build: 2.9 (TS2009)
Size: 1.35MB
Uploaded: 2026-03-20
Downloads:
2
-
0
+

I-81_NY-17_Split_Part_2

This is part 2 of an interchange between I-81 and NY-17 in Binghamton, NY that also
crosses the Chenango River. No road spline is included as this is designed to match
YARN and YARNISH components. Some textures are from Maddy25. Many thanks to her for
permission to use them. This model represents the bridges as they appeared prior to
the 2012 project to re-aline the I-81/NY-17 interchange. Made by request for the D&H
route being developed by ModelerMJ.

Author: Benjamin R. Dorsey (bendorsey)

    I-81_NY-17_Split_Part_2
  • concrete19.jpg 295.50KB
  • concrete19.texture.txt 33 bytes
  • config.txt 2.07KB
  • i-81 ny-17 split part 2.jpg 13.91KB
  • maddy bridge girder - green.bmp 48.05KB
  • maddy bridge girder - green.texture.txt 50 bytes
  • maddy bridge railing.bmp 3.05KB
  • maddy bridge railing.texture.txt 43 bytes
  • part_1.im 1.07MB
  • part_2.im 1.07MB
  • part_3.im 992.21KB
  • part_4.im 1.26MB
  • part_5.im 490.97KB

VE48: This asset uses an obsolete trainz-build number. Trainz-build numbers below 3.5 are no longer supported.
VE107: The high-detail meshes total more than 10000 polygons. This may have a negative impact on performance: 0: 66356
VE109: The low-detail meshes total more than 500 polygons. This may have a negative impact on performance: 0: 66356

Comments:

Sign in to post a comment

User photos

No one has uploaded a photo of this object yet.