shoofly bridge 2

<kuid2:210518:2227:1>

Author: bendorsey
Kind: buildable
Build: 2.2
Size: 493.21KB
Uploaded: 2019-09-21
Loadings:
12
-
0
+

shoofly bridge 2

A single span 2 track through plate girder bridge under going heavy repair or replacement. A temporary trestle
(sometimes called a shoofly) has been erected to ease the bottleneck. Trains would cross under a slow order. The opening in the
trestle is just wide enough for a two lane road or double track main line. This could be used to make an interesting scene on a
route since maintainence equipment exists on the DLS for either on track or off track repair. For those who like operations,
this offers a bit of difficulty in keeping to the schedual.

Author: Benjamin R. Dorsey

    shoofly bridge 2
  • black.bmp 3.05KB
  • black.texture.txt 28 bytes
  • concrete3.jpg 52.57KB
  • concrete3.texture.txt 32 bytes
  • config.txt 3.43KB
  • dark grey.bmp 12.05KB
  • dark grey.texture.txt 32 bytes
  • light grey.bmp 822 bytes
  • light grey.texture.txt 33 bytes
  • part_1.im 1.05MB
  • wall10.jpg 68.85KB
  • wall10.texture.txt 29 bytes
  • wood2.jpg 121.70KB
  • wood2.texture.txt 28 bytes

This item is offered free of charge for your enjoyment. It may not be sold or used in any commercial venture. It may be re-skinned for your personal use.

User photos

No one has added a photo of this object yet