7 Mile Bridge Part 10

<kuid2:210518:3509:2>

Author: bendorsey
Kind: mocrossing
Build: 2.4
Size: 584.37KB
Uploaded: 2019-09-18
Loadings:
18
-
0
+

7 Mile Bridge Part 10

This is the Moser Channel Drawbridge after the construction support trestle
was removed but modified so the arch spline can connect to it. This is offered so downloaders can make
different styles of bridges. It never actually existed. This is normally open and will close at the approach
of a train in 600 keyframes (20 seconds). No water bourn traffic interactivity is included.

Author: Benjamin R. Dorsey

    7 Mile Bridge Part 10
  • anim.kin 42.40KB
  • brass 1.bmp 822 bytes
  • brass 1.texture.txt 30 bytes
  • concrete3.jpg 52.57KB
  • concrete3.texture.txt 32 bytes
  • config.txt 2.46KB
  • darkwood-floor.jpg 13.77KB
  • darkwood-floor.texture.txt 37 bytes
  • door8.jpg 12.71KB
  • door8.texture.txt 28 bytes
  • man dirt2.texture.txt 32 bytes
  • man dirt2.tga 48.53KB
  • metal5.jpg 18.84KB
  • metal5.texture.txt 29 bytes
  • part_1.im 766.36KB
  • part_2.im 187.52KB
  • rusty iron 3.texture.txt 35 bytes
  • rusty iron 3.tga 65.04KB
  • shingle1.jpg 55.21KB
  • shingle1.texture.txt 31 bytes
  • white flat.bmp 48.05KB
  • white flat.texture.txt 33 bytes
  • window9.bmp 96.05KB
  • window9.texture.txt 30 bytes
  • wood2.jpg 23.21KB
  • wood2.texture.txt 28 bytes
  • wood_012.jpg 21.89KB
  • wood_012.texture.txt 31 bytes

User photos

No one has added a photo of this object yet