Morning Freight

<kuid:220074:100102>

Map: Auburn & Donner
Author: Derek_Warreh
Kind: profile
Build: 2.4
Size: 16.30KB
Uploaded: 2019-09-17
Loadings:
7
-
1
+

Morning Freight

The lumber mill needs logs, the pulp mill needs woodchips, and the freight depot needs goods. The session will be complete when you have built up a full stock of goods in the depot. You will be in charge of the locos (except BN log train #4550). You will also be in charge of uncoupling the consists, and switching between locos (you will need to perform a Move to Train command when changing locos). THere are mixed junctions. Some you will have to switch, but most will be automatic.

Author: Derek Warren

    Morning Freight
  • config.txt 3.05KB
  • profile.dat 52.46KB

User photos

No one has added a photo of this object yet