30ng Arched Bridge - End Piece

<kuid2:242091:8241:2>

Author: Col_Klink
Kind: bridge
Build: 2.4
Size: 896.02KB
Uploaded: 2019-03-03
Web-site: none yet
Loadings:
34
-
0
+

30ng Arched Bridge - End Piece

This is a 4 story 3 panel deck truss spline which should be used
as the end piece of the Arched Bridge Trestles Kits. Once the Arched Bridge section has been put in place in the center of the
riverbed, this section should be added to both ends of the center. These add support for the bridge as the abutments approach
the edges of the river on both sides. Thumbnail is provided for view of completed sample. This renovate had originated from a section
of 24ng truss bridge and Heart Pine Boards have been used as well. As always, many thanks to Ben Dorsey for allowing another renovate.

Author: Ken Minasian

    30ng Arched Bridge - End Piece
  • 2_ft_ga_trestle_kit_part_38.im 209.84KB
  • 30_in_ga_trestle_kit_part_38.im 209.84KB
  • arched bridge end support.jpg 7.45KB
  • arched bridge end support.tga 126.58KB
  • completed arched bridge.jpg 288.32KB
  • config.txt 2.52KB
  • end
  • end.im 209.79KB
  • wood2.texture.txt 28 bytes
  • wood2.tga 192.02KB
  • start
  • start.im 209.79KB
  • wood2.texture.txt 28 bytes
  • wood2.tga 192.02KB
  • wood2.texture.txt 28 bytes
  • wood2.tga 192.02KB

User photos

No one has added a photo of this object yet