SLS Copper Ore Transfer

<kuid2:346327:103607:1>

Author: antno
Kind: industry
Build: 3.7
Size: 312.73KB
Uploaded: 2024-10-26
Loadings:
3
-
0
+

SLS Copper Ore Transfer

A small bin set up to act as a holding bin for coal/ore in/out. It has a capacity of two Gilpin 2' orecars (7532 liter) and is made for the TNG project as a small coalstation for the island of Gossen. It is made for 2' track. Thanks to Wulf_9 for the original scripting & special effects help - and Robert Pearson for the extra scripting stuff for this TNG project!
Polygons: 424 (high) and 288 (low)
Size: 3,81 x 4,17 x 6,45 meter

    SLS Copper Ore Transfer
  • $screenshot$.jpg 13.61KB
  • chute_door.wav 32.33KB
  • chute_dump.wav 86.19KB
  • chute_gate.im 13.46KB
  • chute_gate.kin 2.61KB
  • config.txt 18.54KB
  • details.html 112 bytes
  • gossen_orebin.gs 32.08KB
  • icon.tga 16.02KB
  • load
  • load.im 4.49KB
  • load.kin 2.32KB
  • load_map.texture.txt 49 bytes
  • load_map.tga 48.02KB
  • logo_mining.jpg 10.26KB
  • oldwood_panels_low.texture.txt 59 bytes
  • oldwood_panels_low.tga 3.02KB
  • oldwood_planks.texture.txt 55 bytes
  • oldwood_planks.tga 96.04KB
  • orechute_door.texture.txt 54 bytes
  • orechute_door.tga 192.02KB
  • rail.texture.txt 45 bytes
  • rail.tga 3.02KB
  • tng_gossen_coalstation.im 35.57KB
  • tng_gossen_coalstation_lowest.im 24.71KB
  • trackbase.texture.txt 50 bytes
  • trackbase.tga 1.52KB
  • wood_low.texture.txt 49 bytes
  • wood_low.tga 6.02KB

User photos

No one has added a photo of this object yet