Point rodding burying termination,1-4 rods, NSWGR

<kuid:368725:20279>

Author: ElStoko
Kind: buildable
Build: 4.2
Size: 365.54KB
Uploaded: 2019-06-16
Loadings:
31
-
0
+

Point rodding burying termination,1-4 rods, NSWGR

An origin from which to start or a destination at which to end a point rodding run of 1 to 4 rods.
The mesh is a housing under which point rodding emerges from or enters the ground. It could be used for passing a rodding run under a road or railway tracks.

Author: Leigh Stokes (ElStoko)

    Point rodding burying termination,1-4 rods, NSWGR
  • concrete weathered normal-concrete weathered normal.texture.txt 110 bytes
  • concrete weathered normal.tga 256.02KB
  • concrete weathered-concrete weathered.texture.txt 71 bytes
  • concrete weathered.tga 256.02KB
  • config.txt 1.53KB
  • housing.im 2.89KB
  • thumbnail.jpg 8.67KB

User photos

No one has added a photo of this object yet