no image
Details

TCRX Bombardier ALP46A #3082

<kuid:427954:100034>

Author: susanaes
Kind: traincar
Build: 2.9 (TS2009)
Size: 2.04MB
Uploaded: 2026-02-07
Downloads:
4
-
1
+

TCRX Bombardier ALP46A #3082

NJT ordered the first 24 ALP-46 locomotives in December 1999 and an additional five locomotives in September 2001. They were built by Bombardier (formerly ADtranz) at their Kassel, Germany plant. The first two locomotives were built as preseries locomotives for testing?4600 was tested on the TTCI test plant in Pueblo, Colorado, 4601 was sent to Kearny for testing on the NJT network. All locomotives were transported via road to the port of Bremen and shipped on Roro-ships of Wallenius Wilhelmsen Logistics to Port Elizabeth (NJ). The ALP-46 is compatible with NJ Transit's Comet IIM, III, IV, V, and Multilevel fleet. It was also used to pull Amfleet consists on Amtrak's Clocker service in its final days of operation.

In February 2008, NJT ordered 27 ALP-46A locomotives to ensure they have enough motive power for their multilevels when they are all delivered in 2010, an order for 45 more multilevels having been exercised at this time. These new engines have newer technology than their older sisters, being 6?10 years younger, that will allow for increased acceleration and operating efficiency. The ALP-46A's have a top speed of 125 mph (201 km/h). This contract included an option for an additional 33 locomotives, 9 of which were exercised on June 10, 2009 to begin replacement of the ALP-44. These engines are numbered 4629-4664. On November 13, 2009, Bombardier ceremonially handed over the first two completed ALP-46A's (4629?4630) over to New Jersey Transit over at Kassel plant in Germany. They arrived on NJT property on December 13. Locomotive 4629 was shipped by rail to a testing facility in Pueblo, Colorado, while 4630 was placed on the rails at the Meadows Maintenance Complex in Kearny for testing on property and maintenance training. As of April 5, 2011, all locomotives have been delivered.

On June 2, 2010, 4629 entered trial service on the Morris and Essex Lines, coupled to an ALP-46 in case of failure. As of May 7, 2011, all locomotives have entered regular revenue service.

    TCRX Bombardier ALP46A #3082
    253_art
  • 253_art_icon.texture.txt 58 bytes
  • icon.tga 24.04KB
  • thumbnail.jpg 44.85KB
  • 253_body
  • 253 body.bmp 1.00MB
  • 253 body.texture.txt 69 bytes
  • 253 body.tga 3.00MB
  • 253_lod0.im 979.98KB
  • 253_lod1.im 851.57KB
  • 253_lod2.im 554.74KB
  • 253_lod3.im 218.07KB
  • attach_mesh.im 552 bytes
  • auvbg.texture.txt 28 bytes
  • auvbg.tga 48.02KB
  • cristal-cristal.texture.txt 49 bytes
  • cristal.tga 64.04KB
  • detalles 1.bmp 65.05KB
  • detalles 1.texture.txt 73 bytes
  • detalles 1.tga 192.02KB
  • letreros-letreros.texture.txt 51 bytes
  • letreros.tga 1.00MB
  • renfe253_2.lm.txt 262 bytes
  • sombra-sombra.texture.txt 47 bytes
  • sombra.tga 16.02KB
  • 253_night
  • 253_night.im 38.51KB
  • auvbg.bmp 48.05KB
  • auvbg.texture.txt 28 bytes
  • auvbg.tga 48.02KB
  • 253_shadow
  • 253_shadow.im 63.09KB
  • sombra.texture.txt 29 bytes
  • sombra.tga 12.04KB
  • config.txt 7.51KB
Comments:

Sign in to post a comment

User photos

No one has uploaded a photo of this object yet.