Jointed Rail Smart Signal library v1.77a

<kuid2:45324:555100:20>

Author: norfolksouthern37
Kind: library
Build: 4.2
Size: 193.38KB
Uploaded: 2023-03-06
Loadings:
59
-
0
+

Jointed Rail Smart Signal library v1.77a


:20 v 1.77a - Fixed support for SLOW indication. minor changes.
:18 v 1.77 - Added state change support for TRS19 (trainz-build 4.6). (by N3V)
:17 v 1.76 - junction lock added.
:16 v 1.75c - corrections for saving settings.
:15 v 1.75a - Absolute signals no longer signal to back of train. Advance approach style for 2 head signals.
:14 v 1.75 - Additional code for new searchlight set. Head angles can be set on applicable items. New accesory plates. Signal state description improvements.
:13 v 1.7 - Several options expanded to other types, all signals can be approach lit, advance states are optional. code cleanup.
:11 v1.66a - Unbonded 06 signals, string tables
:10 v1.65 - Offset improved, minor changes to logic
:9 v1.64 - Minor code changes
:8 v1.62 - Added B&O CPL controllers
v1.61 - Added PRR PL controllers
v1.5 - Logic tweaks
v1.0 - Basic coding complete

    Jointed Rail Smart Signal library v1.77a
  • 03signal_bo.gs 25.79KB
  • 04signal.gs 28.11KB
  • 04signal_bo.gs 25.49KB
  • 04signal_prr.gs 26.54KB
  • 05signal.gs 33.58KB
  • 05signal_bo.gs 25.64KB
  • 05signal_prr.gs 35.23KB
  • 06dsignal.gs 30.61KB
  • 06dsignal_bo.gs 21.21KB
  • 06dsignal_prr.gs 27.70KB
  • 06signal.gs 39.55KB
  • 06signal_bo.gs 36.09KB
  • 06signal_prr.gs 37.81KB
  • 07signal_bo.gs 29.26KB
  • 07signal_prr.gs 28.14KB
  • 081signal.gs 42.28KB
  • 08signal.gs 42.48KB
  • 08signal_bo.gs 38.00KB
  • art_icon.jpg 61.67KB
  • config.txt 7.40KB
  • jr_library.gs 99 bytes
  • offset_object.gs 3.71KB
  • smartsignal.gs 28.98KB

User photos

No one has added a photo of this object yet