![NG Logging & Mining](https://pp.userapi.com/-PLT7XnQYhMwFXHJvjqy8dEkulBMgkGLF5uFQw/7MS0jJpRKRs.jpg)
NG Logging & Mining
<kuid:47439:104006>
Map: | Murchison 2-2006 Hi-detail |
Author: | sirgibby |
Kind: | profile |
Build: | 2.5 |
Size: | 146.74KB |
Uploaded: | 2024-07-03 |
Loadings: |
1
-
+
|
NG Logging & Mining
THE FAMOUS 3FT NG MURCHISON M-LOGGING LINE & THE NEW 3FT NG MINING LINE
A session simply to explore the heartland of Murchison logging & Mining with a little activity
- Pull an empty load of logging boggies to the Pardoe Bush Mill & exchange for the loaded consist on arrival
- Bring back the loaded consist and unload at the Murchison Dry Sort yard
-------------------
- 45km (28m) of rugged NG logging lines
- 6 logging camps
- 2 bush mills
- spectacular scenery
-------------------
See the early stages of MURCHISON mining (to be completed for STAGE 3)
- Take the Climax with its consist of mining hoppers and load iron ore from the various mines
- Unload at the Nasby mainline transfer building
- NG Logging & Mining
- config.txt 3.42KB
- mine1-512.jpg 96.08KB
- profile.dat 518.75KB
AGREEMENT FOR USE OF SIRGIBBY'S
ADD-ONS FOR AURAN TRAINZ:
By downloading and using these files you agree
to these conditions of use:
· This model is freeware and may be included with a route
You accept the risk and consequences arising from the
use of these files.
· You accept that these files may not work on
any particular system or version of TRAINZ
train simulator.
. The author Michael Sutton retains the
copyright (c) of his original material.
. A copy o
User photos
No one has added a photo of this object yet
Comments:
Sign in to post a comment