UMR2021 -Ashleigh Storage Work
Details

UMR2021 -Ashleigh Storage Work

<kuid:557081:101473>

Map: UMR2021
Author: RJArtim
Kind: profile
Build: 4.7 (TRS19 SP2)
Size: 2.51MB
Uploaded: 2025-12-09
Downloads:
0
-
0
+

UMR2021 -Ashleigh Storage Work

You are doing some switching and loading/unloading.

Work Order:

1. Pick up wheat with the BNSF hoppers at Ashleigh Silos, then put them back in Storage.
2. Drop off the Copper coils at Billoway Copper 2, then bring the empties back to the storage siding where you got them.
3. Drop off corn at Goreway Corn Unloading of the PPG hoppers then take them back to the Storage siding.
4. Next get the tankers and pick up Corn Oil at Goreway Corn Oil 1 and 2 then take them back to the storage sidings.
5. Then take your engines back to your starting point at the shed.

    UMR2021 -Ashleigh Storage Work

User photos

No one has uploaded a photo of this object yet.


1