Autumn- Grains Pickup
<kuid2:605579:100094:4>
Map: | The BNSF Line Complete Route. |
Author: | hiawathamr |
Kind: | profile |
Build: | 3.6 |
Size: | 779.40KB |
Uploaded: | 2022-05-12 |
Loadings: |
36
-
+
|
Autumn- Grains Pickup
During this time of the year, the grain silos in the area start filling up and the trains are in charge of delivering the grain from the silos to other places like Chicago IL, Milwaukee, WI. Your job is to just couple the grain hoppers to your engines, load the train completely, have the engines at the front of the train, and head to Shopiere Yard. Remember; once your train is completely loaded, it will be very heavy, so plan ahead. The line is not super busy, but that doesn't mean you can take your sweet time either. Remember; don't keep the Metra trains behind schedule. Have fun
Start time: 10:00
End time: 10:48
Total time: 48 minutes
- Autumn- Grains Pickup
- autumn- grains pickup.jpg 674.15KB
- config.txt 96.28KB
- profile.dat 347.31KB
- profile.lyr 25 bytes
- profile.obs 36 bytes
- profile.trk 68 bytes
User photos
No one has added a photo of this object yet
Comments:
Sign in to post a comment