Shelton Bar3 - Blast Furnace Chargeside

<kuid2:69379:100058:5>

Map: Loop Line
Author: AndrewH
Kind: profile
Build: 3.7
Size: 412.08KB
Uploaded: 2023-10-07
Loadings:
5
-
0
+

Shelton Bar3 - Blast Furnace Chargeside

The iron ore, coke and limestone which made up the burden for the Etruria blast furnaces were kept in bins that were replenished from wagons brought down from North Yard. This session follows the locomotive assigned for charging duties. Because of the layout at North Yard a second locomotive was used to position the full wagons and remove the empty ones at intermediate sidings which avoided having to run round every consist twice.

The session takes 45 minutes to complete and no input is required.

Author: Andrew Howard (AndrewH)

    Shelton Bar3 - Blast Furnace Chargeside
  • bfcharge.jpg 236.97KB
  • config.txt 160.31KB
  • licence.txt 1.47KB
  • profile.dat 1.05MB
  • profile.lyr 59 bytes
  • profile.obs 476 bytes
  • profile.rlr 36 bytes
  • profile.trk 68 bytes

User photos

No one has added a photo of this object yet