Pinnox Greenhead Trip

<kuid2:69379:100091:6>

Map: Loop Line
Author: AndrewH
Kind: profile
Build: 3.7
Size: 416.15KB
Uploaded: 2023-10-07
Loadings:
5
-
0
+

Pinnox Greenhead Trip

Chatterley Whitfield colliery was the largest coal mine in the UK in the 1930s with an output that exceeded 1 million tons per annum. A large part of the mine's output was destined for the Cheshire salt fields or for export via Liverpool and this entailed a roundabout journey to the south via Stoke. The colliery built the Pinnox Mineral Railway which cut the journey distance and reduced the transport costs. The coal was then transported to Pinnox Junction where it was handed over to the LMS.

The Pinnox Mineral Railway also serviced three coal wharves which handled land sales to local industries and coal merchants. This session follows the Pinnox shunter on a morning trip delivering full wagons to Greenhead coal wharf and returning with empties. The trip takes just over half an hour. Because of the heavy loads and steep gradients great care has to be taken to avoid exceeding the speed limit or getting out of control. All trains must stop before proceeding over the ungated Scotia Road level crossing at Pinnox.

Author: Andrew Howard (AndrewH)

    Pinnox Greenhead Trip
  • config.txt 192.62KB
  • greenhead.jpg 175.93KB
  • licence.txt 1.47KB
  • profile.dat 1.36MB
  • profile.lyr 60 bytes
  • profile.obs 564 bytes
  • profile.rlr 36 bytes
  • profile.trk 68 bytes

User photos

No one has added a photo of this object yet