no image

HM 1b NewBe

<kuid2:69871:100446:1>

Map: HarborMaster 1b
Author: philskene
Kind: profile
Build: 2.4
Size: 79.93KB
Uploaded: 2019-09-17
Loadings:
9
-
0
+

HM 1b NewBe

This is a revised version of the original session on the DLS. It is for use with HarborMaster 1b for TRS2004 and 06, and for 09 in Compatibility Mode.

A pictorial walk through of the session can be found at
http://forums.auran.com/trainz/showthread.php?t=41239

Maps of the route can be found in the package at
http://rapidshare.com/files/231615394/HarborMaster1_Documentation.zip

Chuck, Joe – Dispatcher here. Welcome to our little railroad.
We have an easy first morning for you. Refuel your locomotive and attach those empty log flats standing over in the Container Depot.
Load the flats at the Timber Wharf in the harbor area. Unload the logs at the Log Dump at Matchless Timbers.
Reload the flats with lumber at Matchless and take them to Hyde.
Unload the lumber and reload with empty wooden crates.
Unload the crates at Sintering & Ceramics and reload the flats with 40ft containers at the S&C loader.
Take the containers to the Container Terminal and unload them.
Reload the flats with steel coil at the Heavy Lift Wharf and deliver this to Oleo Wire & Cable.
Load the flats with steel cable for unloading at the Dry Dock.
Finally load the flats with 20ft containers at the Container Terminal and unload these back where you started at the Container Depot. Sign off back at Loco.
All movements can be made as switching movements. You must give way to all other trains. You must keep within the posted speed limits.

The session will take at least two hours to complete.

Everything needed for the session is on the Download Station.

Author: philskene

    HM 1b NewBe
  • config.txt 3.82KB
  • profile.dat 524.17KB
  • thumbnail.jpg 18.02KB

User photos

No one has added a photo of this object yet