HM 1b GondolaShuttle
<kuid2:69871:100459:1>
Map: | HarborMaster 1b |
Author: | philskene |
Kind: | profile |
Build: | 2.4 |
Size: | 80.18KB |
Uploaded: | 2019-09-17 |
Loadings: |
11
-
+
|
HM 1b GondolaShuttle
This session is for HarborMaster 1b for TRS2004 and TRS2006, and for TRS2009 in Compatibility Mode.
All the dependencies need by the session are on the Download Station. The session will take about two hours to complete.
Chuck, Joe – Dispatcher here. Your final turn of the day is what we call the Gondola Shuttle.
Both the Boutique Smelter and the Sintering and Ceramics plants need feedstock. Two gondolas of coal and two of iron ore for the first, and two gondolas of coal and two of ceramic powder for the second.
The coal and iron ore come from the Coal and Minerals Wharf, the ceramics from the Bulk Wharf. You will find two gondolas down in the Classification Yard.
First off, however, the Dry Dock needs plate steel from Alans Multifunctional. Use the two flat cars in Classification to run the plates over.
When finished, give the locomotive to the next crew at the Handover Hut at Classification before signing off. I have booked a taxi two hours from now to take home.
You must keep to all speed limits. You must give priority to all other trains.
A Cab Ride for the session can be seen here
http://forums.auran.com/trainz/showthread.php?t=41629
In TRS2009 make frequent saves because the AI can be fragile.
Author: philskene
- HM 1b GondolaShuttle
- config.txt 3.57KB
- profile.dat 532.09KB
- thumbnail.jpg 18.46KB
User photos
No one has added a photo of this object yet
Comments:
Sign in to post a comment