no image

HM 1b GraveYardShift

<kuid2:69871:100483:1>

Map: HarborMaster 1b
Author: philskene
Kind: profile
Build: 2.4
Size: 79.59KB
Uploaded: 2019-09-17
Loadings:
12
-
0
+

HM 1b GraveYardShift

This session is for HarborMaster 1b for TRS2004 and 06, and for TRS2009 in Compatibility Mode.

All the assets needed by the session are on the Download Station and in the file that can be downloaded here
http://rapidshare.com/files/238425000/RollingStock_RZD_1.cdp

Chuck and Joe, this is the Dispatcher.
A wet and wild night for sure. Hope you have your oil skins.
Refuel your locomotives then haul the loaded gondolas standing in the spur next to the station over to the Scrap Wharf. Leave them there for unloading.
Pick up the flats loaded with the faulty excavators in need of repairs. The flats are parked at the dead end spur at the Coal and Minerals Wharf. Take them to Hymill Write for unloading.
Reload the flats with tank containers at the Container Depot, south road. Unload them at the Container Terminal, middle road. The tank containers will be loaded aboard the ship.
Load the flats with the box girders needed by Sintering and Ceramics. You will find the box girders at the Heavy Lift Wharf, north road. Take them for unloading at S and C where the flats will be reloaded with 40ft containers, which are for unloading back in the Container Depot, south road.
Contact me for your next duties.
You must keep within the prescribed speed limits and you must always give other trains priority. Keep a good lookout.
Good luck, and try to stay warm and dry.
Dispatcher out.

The session will take about 1h30 to complete.

Author: philskene

    HM 1b GraveYardShift
  • config.txt 3.77KB
  • profile.dat 527.23KB
  • thumbnail.jpg 17.91KB

User photos

No one has added a photo of this object yet