no image

HM 1b Sweeper2

<kuid2:69871:100523:1>

Map: HarborMaster 1b
Author: philskene
Kind: profile
Build: 2.4
Size: 61.77KB
Uploaded: 2019-09-17
Loadings:
9
-
0
+

HM 1b Sweeper2

This session is for HarborMaster 1b. It is for TRS2004 and 06, but it will run considerably better in TRS2009 in Compatibility Mode.

All the assets needed by the session are on the Download Station, apart from the Baldwin steam locomotives by Ben Neal.

TRS2009 users should download this file:
http://rapidshare.com/files/258633904/BenNealBaldwins_TRS2009.zip

TRS2004 and 06 users should download the Mogul, Decapod and the Common and Cab files here:
http://www.steammachine.com/bdaneal/gbdl.htm

Chuck and Joe, this is the Dispatcher. The Sweeper again.
Coal and water your locomotive.
Pick up the cars at the Classification Yard and take the east bound route past Portland Cement, up to the Boutique unloaders, past Hyde and the Timber Wharf, reverse into Ships Chandlers, proceed through Heavy Lift and up past Oleo.
Leave the VR cement cars at Portland, the UP box cars in front of the main brick building at Hyde, the empty log skeletons at Timber Wharf, the NP tuscan box cars in one of the spurs at Ships Chandlers, and the GN green box cars in the back loop at Oleo.
Pick up all freight cars as you go. Remember to attach the loaded flats at Heavy Lift.
There is no need to unload or load cars.
Others who have done this shift say that it is easiest to sort the consists in the Classification Yard in the correct sequence and place the cars that have been picked up at the rear of the train. Leave these cars at Classification. They will be sorted by the next shift.
Sign off at the hut down in Classification.
You must keep within the prescribed speed limits and you must give way to all other trains. Keep a good lookout.
Dispatcher out.

The session will take about 1h30 to complete.

Author: philskene

    HM 1b Sweeper2
  • config.txt 4.39KB
  • profile.dat 533.80KB

User photos

No one has added a photo of this object yet