Steel N Scrap 1a

<kuid:69871:10401>

Map: Urban IndustRail 7b
Author: philskene
Kind: profile
Build: 2.4
Size: 336.21KB
Uploaded: 2019-09-17
Loadings:
12
-
1
+

Steel N Scrap 1a

This session is for Urban IndustRail 7b. It uses default Trainz rolling stock, apart from the mill gondola, out-of-gauge steel plate flat car and the UP locomotive. All these items of rolling stock are on the Download Station and will be installed automatically when the session is downloaded, though you will need to manually download kuid 114867:1049, which is the bogey needed by the steel plate flat car. The session should take about three hours to complete.
It is early morning, crisp and clear. You have inspected the locomotive and read the Dispatchers orders:
Attach and load five gondolas with coil at north east plate mill.
Attach and load three red out-of-gauge steel plate flat cars at south east plate mill.
Proceed north to foundry.
Unload and leave three out-of-gauge flat cars at south west unloading dock.
Proceed north to Sydkrome Tools.
Unload two gondolas at eastern unloading area.
Proceed north to Picton with loaded and empty gondolas.
Unload three gondolas at Oleo Wire and Cable, turn locomotive on turntable, inspect loco and take break.
Load five gondolas with scrap at Steptoe Scrap Metals.
Proceed south, attach and load two gondolas at Dunedin scrap wharf.
Proceed south to the steel mill, and dump scrap from six gondolas at scrap receiving and from one gondola into the elevated Basic Oxygen Furnaces.
Return to loco and sign off.
Class 1 railroad trains will be running north at 5 minute intervals.
You are authorised to travel at up to 50mph except in yard areas where normal limits apply.
Ends.

Author: philskene

    Steel N Scrap 1a
  • config.txt 3.96KB
  • profile.dat 1.30MB
  • readme.htm 9.83KB
  • readme.txt 9.20KB
  • ui7_steel_n_scrap_1a_map1.jpg 88.76KB
  • ui7_steel_n_scrap_1a_map2.jpg 89.81KB

User photos

No one has added a photo of this object yet