IndustRail 8a LuggingLumber

<kuid:69871:11559>

Map: Urban IndustRail 8a
Author: philskene
Kind: profile
Build: 2.4
Size: 400.97KB
Uploaded: 2019-09-17
Loadings:
10
-
0
+

IndustRail 8a LuggingLumber

This session is for Urban IndustRail 8a. All the items of rolling stock needed by the session will be downloaded from the Download Station when the session is installed, with the exception of the animated crane used to load the lumber on the flat wagons. This crane can be downloaded from:
http://www.trensim.com/lib/pafiledb.php?lib=trainz&action=file&id=68
Select descarger and then acepto to download the file, then install it into Trainz.
Bill, this is the Train Controller. Yes, I know you have been waiting a long time, but Willie has only now managed to get that D2400 shunter started. What was that? Yes, I know it is not very reliable, yes I know you were against us purchasing it several year back, and yes I know it is very slow. But you know how strapped for cash we are. Anyway, Willie and the crane to load all that lumber onto those flats behind your Class 37 will be with you soon. Maybe in 20 to 30 minutes. Yes, the lumber still needs to be delivered to the factory just north of Boots Concrete Castings. In the 37 that is only a few minutes drive up north from where you are. Unload at the low level platform just beyond the lumber crane. Since we last spoke I have a request from Boots to deliver concrete pipes to Phil Skene Industries. Load them between the yellow markers at the high capacity gantry crane. It is ProtoLARS, so all the flats will load in sequence after a short delay when one flat is stationary between the double markers. Head south and unload at the hi-cap gantry at PSI. Willie will stay at the lumber mill for the next working. After delivering the pipes park the flats in Dunedin yard and report for your next assignment at Dunedin loco. Mainline trains will be running at 5 minute intervals and you must give them priority. You are authorised to travel at up to 50mph except in yard areas where normal limits apply. Cheers.
Maps and a readme are included in the folder containing the session.
To rotate the jib of rail crane, click on the crane, activate NumLock and press the End key in the numeric keypad.
To change cabs in the Class 37, go to cab view (1-key) and press Alt-C

Author: philskene

    IndustRail 8a LuggingLumber
  • config.txt 4.73KB
  • ll_map1.jpg 88.09KB
  • ll_map2.jpg 88.03KB
  • profile.dat 1.71MB
  • readme.htm 7.42KB
  • readme.txt 6.85KB

User photos

No one has added a photo of this object yet