YSC 1a HymillWriteJack
<kuid2:69871:11977:1>
Map: | YardSwitchingCo 1a |
Author: | philskene |
Kind: | profile |
Build: | 2.4 |
Size: | 312.88KB |
Uploaded: | 2019-09-17 |
Loadings: |
15
-
+
|
YSC 1a HymillWriteJack
This session is for YardSwitchingCo 1a. All the items of rolling stock needed by the session will be downloaded from the Download Station when the session is installed.
Chuck and Joe - scattered over the yard you will find all the freight cars that you need.
Take the loaded iron ore and coal hoppers to the foundry at Alans Multifunctional. Unload the cars at the unloading grill. Cars will unload when stationary between the triple yellow markers. Load the resulting hot steel slab onto the short length flat cars. Stop with one flat car centred between the double yellow markers under Alans gantry crane. After a pause of one minute the cars will load in sequence. Unload the steel slab at the triple markers at Hymill-Write.
Load the TTX 89ft flat cars with the Hymill-Write jacks at the double yellow markers. Once one flat car is stationary between the double yellow markers the whole train will load after a one minute delay.
Place the TTX flats in the Transfer Yard and contact the Dispatcher for your next assignment.
You will find that our Class 1 Railroad partner is running a very intensive schedule. You should expect to see their trainz thundering past every two minutes or so. Be very careful where we share their tracks on either side of the main station and keep off the track with concrete sleepers.
Maps and a readme will be found in the folder containing the session.
Author: philskene
- YSC 1a HymillWriteJack
- config.txt 3.81KB
- profile.dat 272.52KB
- readme.htm 12.57KB
- readme.txt 11.71KB
- yardswitchingco_centre.jpg 89.60KB
- yardswitchingco_east.jpg 91.20KB
- yardswitchingco_west.jpg 91.38KB
- ysc1a_hymillwritejack_small.jpg 12.24KB
User photos
No one has added a photo of this object yet
Comments:
Sign in to post a comment