IndustRail 6b North 1a
<kuid:69871:8635>
Map: | Urban IndustRail 6b |
Author: | philskene |
Kind: | profile |
Build: | 2.4 |
Size: | 263.94KB |
Uploaded: | 2019-09-17 |
Loadings: |
24
-
+
|
IndustRail 6b North 1a
This session is for Urban IndustRail 6b. It uses only Trainz default rolling stock, apart from an animated Pullman Standard covered hopper for carrying grains (kuid 112358:4750) and its associated bogey (kuid 112358:17), and the Mill Gondola (kuid 124017:5006) and its associated dependencies. The hopper, gondola and dependencies are all on the Download Station.
It is early afternoon. This is your last duty for the day, in fact for two days because tomorrow, Sunday, is your rostered day off. Your ATSF SD40-2 has been left idling outside the Dispatchers office.
As you sip the fresh brewed coffee you read the Dispatchers orders -
Pick up and load gondolas with metallurgical coke at Coking Plant.
Proceed north. At Port Arthur, pick up and load grain hoppers with grain.
Proceed north. Stop in loop at Hayfore and check for train orders.
Proceed to Sydkrome Tools, unload and leave coke gondolas.
Proceed to Galore, unload and leave grain hoppers.
Pick up and marshal loaded whisky boxcars from distillery and loaded fish boxcars from fish plant at Port Galore.
Proceed south. At Sydkrome Tools, pick up loaded boxcars.
At Dunedin Harbor, attach and load gondolas with scrap metal.
At Steel Works, take loop, unload and leave gondolas at scrap processing plant.
Proceed to Invercargill Transfer and leave boxcars on one of the transfer loops.
Return to Invercargill Loco, turn locomotive and sign off.
You are authorised to travel at up to 50mph except in yard areas where normal speed restrictions must be observed.
You must give way to all trains at shared track.
Ends.
You will find that the Class 1 railroad freight trainz will be running at 5 minute intervals. The Class 1 railroad trainz use the track with concrete sleepers. However, there are many sections of shared track at squeeze points (bridges, tunnels, ... ) and through some yards. You must ALWAYS give right-of-way to the Class 1 railroad trainz.
Maps and a readme are included.
Author: philskene
- IndustRail 6b North 1a
- config.txt 4.55KB
- industrail6bsession1amap1.jpg 90.46KB
- industrail6bsession1amap2.jpg 92.51KB
- profile.dat 817.57KB
- readme.htm 10.67KB
- readme.txt 9.92KB
- text.txt 1.94KB
User photos
No one has added a photo of this object yet
Comments:
Sign in to post a comment