Switch East Shelton
<kuid:87783:1186>
Map: | Midwest Central - V2 BETA3 |
Author: | crb001 |
Kind: | profile |
Build: | 2.6 |
Size: | 126.63KB |
Uploaded: | 2021-12-26 |
Loadings: |
10
-
+
|
Switch East Shelton
Switch East Shelton, a session for the Midwest Central route Release 2, <kuid:87783:1198>. 22 October 2007
In this single-driver session, you run out to the BNSF interchange and pick up some cars left by BNSF Extra 2177. After returning to the yard, get some additonal cars and head over to the East Shelton Industrial Area. Load kegs of beer at the Bock Brewery, unload five hoppers of clay at the Brickworks, and load three flatcars at East Shelton Manufacuring, then return to the yard. Time: about 34 minutes.
Optionally, pickup ten open top hoppers at the yard and head east to the Ashcroft clay pit. Load up and return to the yard. Time: about 30 minutes additional.
Difficulty: Easy. Be sure to visit the Midwest Central website to get your printable Form 19 train orders with detailed instructions for this and other sessions. You'll also find an operations manual and a printable system map. http://trains.0catch.com
- Switch East Shelton
- config.txt 4.15KB
- profile.dat 284.86KB
- swshelton-240.jpg 16.71KB
- swshelton-512.jpg 76.07KB
User photos
No one has added a photo of this object yet
Comments:
Sign in to post a comment